2026-05-28 18:24:06 UTC / 路透社
作者:阿曼达·斯蒂芬森
2026年5月28日 美国中部时间下午6:24 更新于1小时前
5月28日(路透社)——管道运营商South Bow首席执行官贝文·维尔茨巴周四在加拿大卡尔加里能源圆桌会议上表示,在获得“持久”的美国总统许可证明之前,该公司不会启动Keystone XL管道的部分恢复运营工作。
这条连接阿尔伯塔省和怀俄明州的输油管道由South Bow及其美国合作方布里杰管道公司提出,如果项目顺利推进,可将加拿大对美国的原油出口增加12%以上,为加拿大带来亟需的管道外运产能。
《路透社伊朗简报》新闻简报将为您带来伊朗局势的最新动态与分析,点击此处订阅。
美国总统唐纳德·特朗普于4月签署行政令,为重启Keystone XL管道部分线路的项目颁发跨境许可,该项目将把加拿大原油从美加边境运往怀俄明州根西市。
此次新提案的美国境内线路与此前的Keystone XL项目不同,后者因原住民和环保人士多年反对,于2021年被前总统乔·拜登叫停。
该公司5月表示,已开始为其拟议的“草原连接器”项目的美国境内线路争取监管批准。
South Bow由前Keystone XL项目支持者TC能源公司于2024年分拆出来,接管其石油管道业务。加拿大境内已有约150公里(93英里)的管道建成,但自Keystone XL项目叫停以来一直处于闲置状态。
本报由卡塔·卡利亚、达尔纳·巴夫纳在班加罗尔,阿曼达·斯蒂芬森在卡尔加里报道;艾伦·巴罗娜编辑
我们的报道准则:路透社汤森路透信托原则。
Canada’s South Bow flags need for durable US permit before Keystone XL restart
2026-05-28 18:24:06 UTC / Reuters
By Amanda Stephenson
May 28, 2026 6:24 PM UTC Updated 1 hour ago
A supply depot servicing the Keystone XL crude oil pipeline lies idle in Oyen, Alberta, Canada February 1, 2021. REUTERS/Todd Korol/File Photo
May 28 (Reuters) – South Bow will not proceed with a partial revival of the Keystone XL pipeline until it has proof that a U.S. presidential permit is “durable,” the pipeline operator’s CEO, Bevin Wirzba, said on Thursday at the Energy Roundtable conference in Calgary, Canada.
The Alberta-to-Wyoming pipeline, proposed by South Bow and its U.S. partner Bridger Pipeline, could increase Canada’s crude exports to the U.S. by more than 12% if it goes ahead, bringing much-needed pipeline takeaway capacity to Canada.
The Reuters Iran Briefing newsletter keeps you informed with the latest developments and analysis of the Iran war. Sign up here.
U.S. President Donald Trump in April signed an order granting a cross-border permit to a project that would revive parts of the Keystone XL pipeline to transport Canadian oil from the U.S.-Canada border to Guernsey, Wyoming.
The new proposal involves a different route through the U.S. than the previous Keystone XL project, which was canceled by former President Joe Biden in 2021 after years of Indigenous and environmental opposition.
The company said in May it had begun work to secure regulatory approvals along the U.S. route of its proposed Prairie Connector project.
South Bow was spun off by former Keystone XL proponent TC Energy in 2024 to take over its oil pipeline business. Approximately 150 km (93 miles) of pipe has been built in Canada, sitting idle since Keystone XL’s cancellation.
Reporting by Katha Kalia and Dharna Bafna in Bengaluru and Amanda Stephenson in Calgary; editing by Alan Barona
Our Standards: The Thomson Reuters Trust Principles.
发表回复